Engineering, procurement, construction and commissioning of 3 units of 33,333 m3/day each (100,000 m3/day in total) in 1982-1986 and 1 additional unit of 35,000 m3/day in 1991-1994. The 4 units are based on the MSF with brine recirculation principle