Umm Al Naar West & East - United Arab Emirates (Abu Dhabi)

MSF-BR - 7 units of 27,500 m3/day (192,500 m3 daily production)

Scope of work

Engineering, procurement, construction and commissioning of 3 units of 27,500 m3/day each at Umm Al Naar East in 1976-1979, and 4 additional units of same capacity at Umm Al Naar West in 1980-1987. The total installed capacity at both sides is 192,500 m3/day. The uniis are based on the MSF with brine recirculation process.